Solids DeWatering
This project included construction of a solids dewatering facility with a design capacity to accommodate solids produced. A new sludge transfer pump station was constructed at the central plant, consisting of wet wells for primary and thickened waste activated sludge, six processing cavity pumps and associated piping and controls.
Location
Las Vegas, Nevada
Scope of Work
HVAC / Foul Air Movement / Odor Control / Mechanical Piping
Engineer
CH2M Hill
General Contractor
MMC
Let’s Get Started on Your Next Project
We are Utah’s premier HVAC manufacturer, we take great pride in our work, let us know how we can help you with your next project.