Salt Palace Renovation
In preperation for the 2002 Olympics in Salt Lake City we were required to plan nearly a year ahead of schedule to provide a near perfect schedule. Innovating design that was implemented using exisitng garage openings for additional outside air to supplement the existing air conditioning system for the heat generated by the increase of press equipment. Large fans installed in the existing garage doors blew air into 60-inch fabric ductwork to solve the problem.
Location
Salt Lake City, Utah
Scope of Work
Redevelop system / Energy Efficient HVAC System
Engineer
General Contractor
Let’s Get Started on Your Next Project
We are Utah’s premier HVAC manufacturer, we take great pride in our work, let us know how we can help you with your next project.