HISTORICAL RENOVATION

Salt Palace Renovation

January 15, 2002

$1,700,000

Salt Lake City, Utah

Scope of Work: Redevelop system / Energy Efficient HVAC System

In preperation for the 2002 Olympics in Salt Lake City we were required to plan nearly a year ahead of schedule to provide a near perfect schedule. Innovating design that was implemented using exisitng garage openings for additional outside air to supplement the existing air conditioning system for the heat generated by the increase of press equipment. Large fans installed in the existing garage doors blew air into 60-inch fabric ductwork to solve the problem. 

Please reload

Have a project? Lets talk.

General Questions
Mon - Thursday (5am - 5pm) Friday (6am - 3pm)

Navigation

 2019 United Team Mechanical LLC. All rights reserved.